Modular and/or prefabricated buildings minimise waste and emissions and drastically reduce construction times, but it is seldom used on a major scale, especially in Australia.
Housing stock is needed now, and with a lack of skilled labourers and materials, we have to look at alternatives. In this panel we will assess the suitability for modular and prefabricated built forms in the context of our national housing crisis, and what needs to be done for it to be adopted at scale.
Learning Outcomes
By attending this presentation, you should be able to:
(Competency codes: PC 3, PC 10, PC 20, PC 28)
Attend the Sustainability Summit in-person or online to gain up to 10 CPD points, access keynote and panel discussions, join interactive Q&A, network with peers, and revisit sessions with 30-day on-demand recordings.
Environa Studios
Rothelowman
WoodSolutions
Deco
Case Meallin
Studio Johnston
Woods Bagot