Modular and/or prefabricated buildings minimise waste and emissions and drastically reduce construction times, but it is seldom used on a major scale, especially in Australia.
Housing stock is needed now, and with a lack of skilled labourers and materials, we have to look at alternatives. In this panel we will assess the suitability for modular and prefabricated built forms in the context of our national housing crisis, and what needs to be done for it to be adopted at scale.
Learning Outcomes
By attending this presentation, you should be able to:
(Competency codes: PC 3, PC 10, PC 20, PC 28)
The 2025 Sustainability Summit was held on 19 November 2025. Ticket holders can watch the recorded session on demand until 19 December 2025.
Environa Studios
Rothelowman
WoodSolutions
Deco
Case Meallin
Studio Johnston
Woods Bagot